Module 5, Lesson 1: The Build Pre-reqs
Before We Start
From previous lessons:
- Your landing page is live and collecting emails. Module 4, Lesson 1
- Your mailing list is connected and tagging signups by source. Module 4, Lesson 2
- Your Meta ad is live and driving traffic to the landing page. Module 4, Lessons 7 to 8
- Your project board is set up in YouTrack with phases scoped out. Module 3, Lessons 6 to 9
- Claude Code is installed and connected to your project. Module 3, Lesson 3
- WebStorm is set up and bootstrapped for the project. Module 3, Lesson 1
Tools / setup you'll need:
- Claude Desktop (the desktop app, not the mobile app). Updated to the latest version
- WebStorm, already bootstrapped
- Your Obsidian vault with all the documents Claude generated back in Module 2
By the end of this lesson, you'll:
- Have confirmed you're actually ready to start building. Not just assumed it
- Know exactly which Claude Desktop tabs you need before Phase 1 starts
- Have your GTM, market research, summary, technical, and UX/UI docs within easy reach for the build phase ahead